Application Form Submission.

Applicants need to submit their  compeleted application form along with the supporting documents to the following emails: 

1. sitifatimah@mgtc.gov.my

2. adriana@mgtc.gov.my

 

Please click below to download the application form & letter of undertaking here:

Application Form

Letter of Undertaking

 

GENERAL INFORMATION

GTFS applications are to be submitted online through email. 

There are 5 sections in the Application Form that must be completed before submitting. 

In addition to the Application Form, applicants are also required to submit a signed copy of the Undertaking Letter that can be downloaded above. 

A. COMPANY INFORMATION

A.1 PROJECT APPLICANT

Applicants are required to fill in basic information of the company such as the type of company, current paid-up capital and the primary contact person. Applicants would also need to provide information for the primary contact person, a list of the latest shareholders and the company's type of registration. Applicants are also required to clarify the contribution from the proposed green projects in terms of revenue, gross profit and net profit.

A.2 PROJECT MANAGEMENT TEAM (PMT)

Applicants are required to list all key personnel involved in this project including their qualifications, position in the project and their number of years in working experience.

A.3 PROJECT PARTNER

If applicable, applicants are required to provide information for their project partner's company. Information includes the information on the primary contact person, brief description of core business and their role in the proposed green project.

B. PROJECT DESCRIPTION

B.1 PROJECT LOCATION

Please state clearly the objectives of the proposed project e.g. CO2 reduction, energy savings, water savings, pollution reduction, etc.

B.2 PROJECT OBJECTIVE & CRITERIA

Please state the type of project with reference to the project eligibility criteria in the GTFS Procedures & Guidelines.

B.3 DESCRIPTION OF PROPOSED PROJECT

Address of Project Site Please state full address of the actual project location.

Brief Description of the GT Project Boundary Please indicate and provide evidence of the proposed GT Project Boundary in relation to the above project site ;i.e. plot plan, overall plant layout drawings, building layout drawings, etc.

B.4 PROJECT SIZE 

Please indicate the project size and provide relevant document in relation to project production capacity/energy consumption/ equipment rating, etc.

B.5 EMPLOYMENT

Please provide list of all employees that will be involved in this project under both categories of new employees upon the commissioning of the project and the existing employees.

B.6 PROJECT OUTCOME

This section concerns the pollution parameters that can be measured before and after the project's commissioning.

B.7 EXPECTED COMPLETION DATE

SECTION C: PROJECT FINANCING

B.6b Description of the technology to be applied for the proposed project.

Please describe the technology to be applied for the proposed project and provide relevant information about technology provider, origin of technology, proven track record, standard certifications, laboratory test reports, equipment manufacturer, environmental certifications, efficiency rating, approved shop drawings, etc.

B.6c Please also indicate and elaborate as to how this project can be considered as an improvement to the existing technology.

Please describe the contribution of the proposed technology to solve problem or set back e.g. efficiency improvement, pollution reduction or elimination, avoidance or minimisation of hazardous material , etc.

B.6d Kindly indicate if the project involves a transfer of technology.

Please describe the concept ,implementation and milestones of technology transfer program.

B.7 Expected Completion Date

Please provide detail on project implementation schedule and key milestones. To support the technical viability of the project, please provide necessary approval document (if required for project implementation);i.e.

  • Environment Impact Assessment Report,
  • Small Renewable Energy Project approval,
  • Renewal Energy Purchase Agreement,
  • Energy Performance Contract,
  • Land Purchase/Tenancy Agreement,
  • Development Order,
  • Product Purchase Contract,
  • Fuel Supply Agreement ,etc.

B.8 What type of sectors will benefit from this project

Please specify the type of sector/s that will benefit from this project e.g. Residential, Commercial, Industrial, Manufacturing, Construction, Mining, Transportation, Agriculture, others.

B.9 Project Outcome (where applicable)

Please provide improvement parameters involved and their values before and after the project implementation. Please show the calculation details to support the proposed project impact.

 

C. PROJECT FINANCING

Please provide detailed list of equipments/systems for the cost of GT expenditures and other items for non-GT expenditures. Also state the percentage of IRR and ROI

 

D. PROJECT MONITORING AND VERIFICATION

D1. Measurement and Verification

Please explain the measurement and verification (M&V) procedures to be applied for this project. The same M&V shall be used in the preparation of Project Outcome report. The procedure shall include M&V parameters, qualified personnel, measurement schedule, standard M&V reference and all measuring apparatus (meters/sensors ; Permanently installed/ portable). Please provide shop drawings to indicate metering and sensors locations.

 

E. CHECKLIST

This section is intended for applicants to cross-check the submitted documents and making sure that all of the requested documents are complete for submission. Incomplete or inaccurate supporting document submission might result in delay of the application process.

F. DECLARATION

Please declare that you have read and understood all the terms and conditions and to the best of your knowledge filled the form accurately, duly complied with the GTFS Procedures and Guidelines. This declaration is an official commitment that if your company is granted financing facilities under GTFS, you are not permitted to make any changes to the project specifications without prior written approval from MGTC.